Testing the capability of the Titan Bridge layer.
This platform was a replacement for the Chieftain Armored Bridge Layer, and is based on the Challenger 2 platform.
Day Time operation.Beginning operation

part way through.

almost complete.

Crossing.
Night Time Operation.For Health and Safety reasons we have fitted the orange beacons (Winky Pots)

part way through.

Bridge layed.

Crossing.

2nd vehicle crossing.
