Testing the capability of the Titan Bridge layer.
This platform was a replacement for the Chieftain Armored Bridge Layer, and is based on the Challenger 2 platform.
Day Time operation.Beginning operation
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_211931_200-3d_zps2ylldsln.jpg)
part way through.
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_211428_684-3d_zpsxvnr0e0y.jpg)
almost complete.
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_211453_951-3d_zps7nnyftjl.jpg)
Crossing.
Night Time Operation.For Health and Safety reasons we have fitted the orange beacons (Winky Pots)
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_214152_462-3d_zpsk2swqyak.jpg)
part way through.
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_214327_496-3d_zpszjmlsv6h.jpg)
Bridge layed.
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_214344_923-3d_zpsq7rcd4cn.jpg)
Crossing.
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_214421_835-3d_zpsvim69mrh.jpg)
2nd vehicle crossing.
![](http://i1318.photobucket.com/albums/t660/Peter_James_Wilson/20151229_214842_618-3d_zpsnnfpzhil.jpg)