VBS

052214_wargames_trainer_640

Titan

Started by wilso845, December 29, 2015, 10:11:32 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

wilso845

Testing the capability of the Titan Bridge layer.

This platform was a replacement for the Chieftain Armored Bridge Layer, and is based on the Challenger 2 platform.

Day Time operation.

Beginning operation



part way through.



almost complete.



Crossing.



Night Time Operation.

For Health and Safety reasons we have fitted the orange beacons (Winky Pots)



part way through.



Bridge layed.



Crossing.



2nd vehicle crossing.


panthera283

very nice screenshots , thanks for sharing

Asid

Agreed

Thank you for taking the time to post all the screens

I stand against Racism, Bigotry and Bullying